Skip to main content
We would like to wish you a very Merry Christmas and a Happy New Year!!
Click Here for Christmas Delivery Times

Please note our offices and warehouses will be closed from 24th December until 2nd January 2025.

In-stock orders placed before 4:30pm on Friday 20th December should arrive before Christmas on a Next Working Day Delivery service. We are unable to guarantee this, however, as we rely on external couriers. Orders placed after this time will be processed and despatched as normal, but we cannot guarantee a pre-Christmas delivery. Any orders placed on Tuesday 24th December, or during the festive period, will be delivered in the first working days of the new year.

We recommend you place your order early, and look forward to serving you again in 2025.

Tarmac Bolt Fitting Instructions

Home / Installation Guides / Tarmac Bolt Fitting Instructions

Your product is designed to go on to a completely flat surface, it is imperative that this happens as it may weaken your structure when erected. It is vital that all manufacturers’ instructions are followed to ensure that maximum strength is achieved.

  1. It is very important that your structure is secured to the ground correctly and all fixings are used as this could seriously compromise the strength of your product once erected.
  2. Drill a 20mm hole in the tarmac at the chosen locations ensuring you have drilled down to the length of the fixing bolt.
  3. Insert the rubber sleeve into the drilled hole. You may require some force as the size of the hole is deliberately a tight fit on the rubber sleeve.
  4. Place the holes of the “foot plates” above the freshly inserted rubber sleeve part of the fixing and introduce the M10 fixing bolt and zinc washer supplied.
  5. Torque the bolt until tight ensuring the rubber sleeve has expanded underneath the tarmac.

 

Notes

Please ensure you drill a 20mm hole, as a slightly oversized hole could compromise the strength of the fixing.

If the above instructions have been carried out correctly the bolt will not lift unless the force on the fixing bolt is great enough to also pull up the surrounding tarmac.

Contacts

Should you have any questions relating to the installation of the above, please feel free to contact any of our specialist team

Image Full

Tools Required:

Drill with 20mm drill bit Suitable components for tarmac drilling

17mm spanner To torque bolt

Soft Hammer To aid in fitting rubber sleeve into hole