Scaffold Tower Check Book
Scaffold Tower Check Book
“Towers must be inspected as often as necessary to ensure their safety. It must be inspected after assembly, before use and after any event likely to have affected its stability or structural integrity. The tower should be re-inspected at suitable intervals but at least every 7 days when on site. A record of completed inspection reports should be kept until work is completed and for at least a further 3 months thereafter. All components should be checked to ensure that they are in good condition.” Ref: PASMA (Prefabricated Access Suppliers’ and Manufacturers’ Association) – The trade association for the UK mobile access tower industry.
- Spot potential faults before they develop into a more serious and costly defect
- Contains 25 individual checklists relating to components and structural checks to be completed before the scaffold tower is used
- Allows workers to easily carry out pre-use inspection checks
- Includes useful guidance notes to remind operatives what to look for during their inspection
- Designed to help improve safety and promote good working practices
- Duplicate carbon copies are retained in the book for management records
- Reduce maintenance costs and ensure compliance with legal responsibilities
Price List - To order please specify a quantity. Then click the "Add to Basket" button.
“Towers must be inspected as often as necessary to ensure their safety. It must be inspected after assembly, before use and after any event likely to have affected its stability or structural integrity. The tower should be re-inspected at suitable intervals but at least every 7 days when on site. A record of completed inspection reports should be kept until work is completed and for at least a further 3 months thereafter. All components should be checked to ensure that they are in good condition.” Ref: PASMA (Prefabricated Access Suppliers’ and Manufacturers’ Association) – The trade association for the UK mobile access tower industry.
- Spot potential faults before they develop into a more serious and costly defect
- Contains 25 individual checklists relating to components and structural checks to be completed before the scaffold tower is used
- Allows workers to easily carry out pre-use inspection checks
24 Hours Despatch
Order before 4:30pm*
Free delivery
On orders over £25 ex VAT
30 day guarantee
No quibble returns policy
Buy on account
£500 credit for businesses