Skip to main content
Home Safety Essentials Good To Go Equipment Inspection Systems Fixed Scaffolding Check Book

Fixed Scaffolding Check Book

Fixed Scaffolding Check Book

  • slider-image-0
Item 1 of 4
  • slider-image-0
  • slider-image-1
  • slider-image-2
Item 1 of 4

“All scaffolding should display a “DO NOT USE” notice for restricting access to the scaffold until it has been inspected and handover completed. A tag inspection system (if used) shall be completed and located at the access point of the scaffold. Regular statutory inspections of the scaffolding shall take place at least every 7 days or after any event likely to have affected the scaffold’s stability. The tag system insert will also be updated to record the inspection”. Ref: NASC (National Access & Scaffolding Confederation)

  • Spot potential faults before they develop into a more serious and costly defect
  • Contains 25 individual checklists relating to components and structural checks to be completed before the scaffold is used
  • Allows workers to easily carry out pre-use inspection checks
  • Includes useful guidance notes to remind operatives what to look for during their inspection of system scaffolding and/or tube and fitting scaffolding in line with TG20:13 guidance
  • Designed to help improve safety and promote good working practices
  • Duplicate carbon copies are retained in the book for management records
  • Reduce maintenance costs and ensure compliance with legal responsibilities
Prices excludes VAT at 20%

Price List - To order please specify a quantity. Then click the "Add to Basket" button.

XY7946 - Fixed Scaffolding Check Book

Description Fixed Scaffolding Check Book
1 £6.04
2 - 4 £5.78
5 - 9 £5.62
10 - 19 £5.46
20+ £5.31
Quantity

XY7939 - Status Tag

Description Status Tag
Dimensions H120 x W51 x D12mm
1 £7.83
2 - 4 £7.67
5 - 9 £7.51
10 - 19 £7.35
20+ £7.20
Quantity

XY7940 - Tamper Evident Seals

Description Tamper Seals
Pack Qty 100 Seals
1 £11.82
2 - 4 £11.66
5 - 9 £11.50
10 - 19 £11.34
20+ £11.19
Quantity

“All scaffolding should display a “DO NOT USE” notice for restricting access to the scaffold until it has been inspected and handover completed. A tag inspection system (if used) shall be completed and located at the access point of the scaffold. Regular statutory inspections of the scaffolding shall take place at least every 7 days or after any event likely to have affected the scaffold’s stability. The tag system insert will also be updated to record the inspection”. Ref: NASC (National Access & Scaffolding Confederation)

  • Spot potential faults before they develop into a more serious and costly defect
  • Contains 25 individual checklists relating to components and structural checks to be completed before the scaffold is used
  • Allows workers to easily carry out pre-use inspection checks
Image Full

24 Hours Despatch

Order before 4:30pm*

Image Full

Free delivery

On orders over £25 ex VAT

Image Full

30 day guarantee

No quibble returns policy

Image Full

Buy on account

£500 credit for businesses

Our Customer Reviews and Ratings from TrustPilot